One extraction workflow distributed to 3 departments, reducing per-drawing review from days to hours across a 50–100 drawing project cycle.

A supercritical boiler project generates 50 to 100 weld detail drawings. Design & Engineering, Manufacturing, and Procurement teams each reviewed every drawing independently with no shared workflow.
ADEOS extracts dimensional data from vendor drawings, while an automated processing pipeline applies the formula library to generate department-specific outputs.
| Impact Metric | Before | After |
|---|---|---|
Review Duplication | 3× | 1× |
Extraction Time | 2–5 days | 4–8 hrs |
Formula Application | 10–20 mins | <1 min |
ADEOS standardizes engineering documents into structured, reusable data. Sharing one verified list directly with manufacturing, planning, and quality teams removes double-checking.
Ready to see how our engineering-first AI solutions can streamline your operations and drive real impact?

Per-job turnaround targeted to drop from 3-4 days to under 3 hours, monthly capacity to scale from 12-20 to 75-80 panels, and duplicate item-master entries eliminated through automated de-duplication against Zoho ERP

Verification turnaround time reduced from 3 hours to 15 minutes, missing dimension detection improved to 93%, and manual review reduced to flagged discrepancies for quality engineers

80–90% reduction in manual effort per drawing, processing capacity scaled to 200 drawings per day, consistent two-sheet Excel output for every extraction